Summit DW18SS2 Installation Manual Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 25
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
3
USA
2. TOOLS WHICH MAY BE NEEDED
3. MATERIALS WHICH MAY BE NEEDED
(Additional materials may be required to comply with local codes)
Hot Water Supply Line - Minimum 3/8” O.D. copper tubing or metal braided
dishwasher supply line.
UL listed conduit connector or strain relief.
Teontapeorotherpipethreadcompoundtosealplumbingconnections.
Shut-off valve and fittings appropriate for hot water supply line (copper
tubing/compression fitting, or braided hose).
Silicone
Glue
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 24 25

Comments to this Manuals

No comments